Reports
Structural Report
The purpose of this report is to assess the damaged brick wall and C steel channel column adjacent to the large door opening on the western elevation of Factory 8, including temporary support requirements, demolition strategy, and repair works.
Structural Report 2
The purpose of this report is to assess the damaged brick wall over the roll-a-door opening at the south elevation of Factory 2, including temporary support requirements, demolition strategy, and rebuilding options.
Revised Flood Assessment
The purpose of this report is to assess stormwater flows through the existing Council pipe crossing the site, including 20-year and 100-year ARI events and potential impacts from the proposed redevelopment.
Dilapidation Report
The purpose of this report is to document a site inspection and visual assessment carried out on 3rd June 2016 at the request of the client.
Building Report
The purpose of this report is to assess the present condition of a newly constructed or renovated detached secondary structure following a visual site inspection.
Dilapidation Report 2
The purpose of this report is to document a visual inspection and assess the condition of the site at the request of the client.