Structural Report
The purpose of this report is to assess the damaged brick wall over a roll-a-door opening, south elevation, Factory
![](https://staging.engineeringsydney.com.au/wp-content/uploads/2022/06/engineering-firm-29.png)
Structural Report 2
The purpose of this report is to assess the damaged brick wall over a roll-a-door opening, south elevation, Factory
![](https://staging.engineeringsydney.com.au/wp-content/uploads/2022/06/engineering-firm-30.png)
Revised Flood Assessment
The purpose of this report is to assess the damaged brick wall over a roll-a-door opening, south elevation, Factory
![](https://staging.engineeringsydney.com.au/wp-content/uploads/2022/06/engineering-firm-34.png)
Dilapidation Report
The purpose of this report is to assess the damaged brick wall over a roll-a-door opening, south elevation, Factory
![](https://staging.engineeringsydney.com.au/wp-content/uploads/2022/06/engineering-firm-31.png)
Building Report
The purpose of this document is to report the present condition of a newly constructed/renovated, detached secondary structure.
![](https://staging.engineeringsydney.com.au/wp-content/uploads/2022/06/engineering-firm-34.png)
Dilapidation Report 2
The writer of this report visited the site on the in order to carry out a visual inspection.